Installation method of wall-mounted industrial computer, detailed steps
Wall-mounted industrial computer has the advantages of small space occupation, high integration, good compatibility, etc. It is the first choice for many industrial occasions. This article will introduce the installation method and steps of custom wall mount pc to ensure the correct installation and use of the equipment and optimize the work efficiency of the industrial site.
Table of Contents

1. Preparation
(1). Make sure that the appropriate custom wall mounted pc model and the appropriate installation accessories have been selected.
(2). Verify the load-bearing capacity of the installation wall to ensure that the wall can firmly support the weight of the industrial computer.
(3). Disconnect all power supplies and take electrostatic protection measures to ensure safety during the installation process.
(4). Prepare the necessary tools, such as screwdrivers, drills, levels, etc.
2. Installation steps
(I) Install the bracket
1. Mark the drilling position on the wall according to the installation hole position of the industrial computer bracket.
2. Use a drill to drill holes in the wall, and then insert the expansion screws into the holes.
3. Align the wall bracket with the installation hole position and fix it to the wall with screws.
4. Use a level to check if the bracket is installed horizontally, and adjust if necessary to ensure that the bracket is vertical.
(II) Fixing the industrial computer
1. Pick up the industrial computer and align the hook on its back with the wall bracket.
2. After confirming that the hook and the bracket are completely matched, carefully hang the industrial computer on the bracket.
3. Check whether the industrial computer is firmly fixed on the bracket to ensure that there is no shaking.

(III) Connecting lines
1. According to your system requirements, connect the power cord, data cable, network cable, etc. to the corresponding ports of the industrial computer.
2. If the industrial computer needs to communicate with other devices, please ensure that all lines are connected correctly.
3. Perform line management to ensure that the lines are neat and orderly, which is both beautiful and easy to maintain in the future.
(IV) Power on and debug
1. Turn on the power, start the industrial computer, and enter the system for basic settings.
2. Perform system configuration and software installation according to actual application requirements.
3. Test whether the functions of the industrial computer are normal, including reading and writing of interfaces, network connectivity, etc.
4. After debugging, lock the system settings to ensure stable operation of the industrial computer.
3. Precautions
4. Conclusion
The installation of the industrial computer seems simple, but the correct installation method is the premise to ensure the normal operation of the equipment. Refer to the steps and precautions provided by Dongtian to ensure the efficient operation and long-term stability of the industrial computer in the industrial site. If you have any questions, you can call Dongtian customer service for consultation.
You may also be interested in:
LET'S TALK ABOUT YOUR PROJECTS
- sinsmarttech@gmail.com
-
3F, Block A, Future Research & Innovation Park, Yuhang District, Hangzhou, Zhejiang, China
Our experts will solve them in no time.

Rackmount PC
Embedded Computing
Industrial Portable Computers
Rugged Tablets
Rugged Laptop
Industrial Panel PC
Rugged Handheld
Advantech Industrial PC